Current Construction Projects

BNSF Ono Lead Track Extension

This project involves BNSF Railway Company installing a fourth lead track extending BNSF's San Bernardino Intermodal Facility lead track to the two existing Ono Storage Sidings (project). It includes the installation of track components and facilities within and along approximately 4.3 miles of the existing BNSF corridor, generally from the BNSF overpass at the State St or University Parkway on the north side to the existing San Bernardino Intermodal Facility at west 5th street on the south.

Status: Under Construction

BNSF_Ono

Shandin Hills Booster Station Site Improvements

This project involves the design of site improvements at the existing Shandin Hills Booster Station. The project site is subject to localized stormwater flooding during high-intensity storms. During recent storms, rain events have resulted in claims for site remediation costs.

Status: Under Construction

ShandinHills

State Route 66 Water Facilities Relocations

The State of California Department of Transportation (Caltrans) proposes to rehabilitate the roadway along State Route 66 (SR-66) from Pepper Avenue to "H" Street, spanning approximately 3.1 miles. In accordance with Caltrans' policy, the project also incorporates "complete streets elements" that are targeted to expand equitable and sustainable mobility statewide. The Department owns and operates numerous sewer and water pipelines within Caltrans' right-of-way that conflict with the proposed highway improvements. Therefore, SBMWD utility infrastructure relocations are necessary to accommodate the construction of the proposed SR-66 improvements by Caltrans.

Status: Under Construction

Route 66_3

System Wide 2 SRF - Upper Zone Replacements & Mountain Sub-Zone B & Fremontia Drive

This project involves consolidating various water pipeline replacement projects throughout SBMWD's service area, with the following general pipeline replacement locations.

- Fremontia Drive/23rd Street, from 26th Street to Valencia Avenue, Mallory and Shandin Hills area.

Status: Under Construction

Sytem Wide 2SRF


Tertiary Treatment System

This project involves construction of a five MGD tertiary system to meet Title 22 standards (eliminates use of groundwater for plant utility) and reduces hydraulic loading to RIX Facility.

Status: Under Construction.

Tertiary

Verdemont 2300 Pressure Zone East Water Facilities

The project involves the installation of a one-million-gallon 2300 pressure zone tank, a 2000 GPD Booster Station, and 2900 feet of transmission pipeline.

Status:  Under Construction

Verdemont3

Water Facilities Relocation - Phase I Project

The project involves the architectural design and construction necessary to relocate Water Department staff from various locations of the City to 397 Chandler Ave. The project includes a new administration facility and all associated site improvements.

Status: Under Construction.