- Home
- Your Water
- Active Construction Projects
Active Construction Projects
The San Bernardino Municipal Water Department’s Engineering Section develops and implements the Department’s Capital Improvement Program (CIP) throughout the design and construction phases for water utility, sewer collection, and wastewater treatment infrastructures.
SBMWD’s construction management team will closely monitor construction activities in order to minimize community impacts and ensure all work is done within normal construction guidelines.
SBMWD understands that construction can create an inconvenience to neighbors and businesses. Messages received after normal business hours will be returned between 8:00 a.m. to 5:00 p.m. on the next business day.
Questions or Concerns: (909) 453-6175
Email: Construction@sbmwd.org
Current Construction Projects
BNSF Ono Lead Track Extension
This project involves BNSF Railway Company installing a fourth lead track extending BNSF's San Bernardino Intermodal Facility lead track to the two existing Ono Storage Sidings (project). It includes the installation of track components and facilities within and along approximately 4.3 miles of the existing BNSF corridor, generally from the BNSF overpass at the State St or University Parkway on the north side to the existing San Bernardino Intermodal Facility at west 5th street on the south.
Status: Under Construction
Shandin Hills Booster Station Site Improvements
This project involves the design of site improvements at the existing Shandin Hills Booster Station. The project site is subject to localized stormwater flooding during high-intensity storms. During recent storms, rain events have resulted in claims for site remediation costs.
Status: Under Construction
State Route 66 Water Facilities Relocations
The State of California Department of Transportation (Caltrans) proposes to rehabilitate the roadway along State Route 66 (SR-66) from Pepper Avenue to "H" Street, spanning approximately 3.1 miles. In accordance with Caltrans' policy, the project also incorporates "complete streets elements" that are targeted to expand equitable and sustainable mobility statewide. The Department owns and operates numerous sewer and water pipelines within Caltrans' right-of-way that conflict with the proposed highway improvements. Therefore, SBMWD utility infrastructure relocations are necessary to accommodate the construction of the proposed SR-66 improvements by Caltrans.
Status: Under Construction
System Wide 2 SRF - Upper Zone Replacements & Mountain Sub-Zone B & Fremontia Drive
This project involves consolidating various water pipeline replacement projects throughout SBMWD's service area, with the following general pipeline replacement locations.
- Fremontia Drive/23rd Street, from 26th Street to Valencia Avenue, Mallory and Shandin Hills area.
Status: Under Construction
Tertiary Treatment System
This project involves construction of a five MGD tertiary system to meet Title 22 standards (eliminates use of groundwater for plant utility) and reduces hydraulic loading to RIX Facility.
Status: Under Construction.
Verdemont 2300 Pressure Zone East Water Facilities
The project involves the installation of a one-million-gallon 2300 pressure zone tank, a 2000 GPD Booster Station, and 2900 feet of transmission pipeline.
Status: Under Construction
Water Facilities Relocation - Phase I Project
The project involves the architectural design and construction necessary to relocate Water Department staff from various locations of the City to 397 Chandler Ave. The project includes a new administration facility and all associated site improvements.
Status: Under Construction.