- Home
- About Us
- Divisions
- Water Reclamation
- Tertiary Treatment System
Tertiary Treatment System
Project Overview
The San Bernardino Municipal Water Department is committed to building a reliable water supply for our customers. The Department is hard at work on projects like the Tertiary Treatment System which will recycle treated wastewater currently being sent down the Santa Ana River and reuse it for the benefit of our local water resources.
Environmental Impact Report
- Notice of Availability of the Draft Environmental Impact Report (PDF)
- Draft Environmental Impact Report (PDF)
- 01 Final Environmental Impact Report Cover Chapter 1 (PDF)
- 02A Final Environmental Impact Report Chapter 2 Letters A Through L (PDF)
- 02B Final Environmental Impact Report Chapter 2 Letters M Through Z (PDF)
- 03 Final Environmental Impact Report Chapter 3 (PDF)
- 04A Final Environmental Impact Report Appendices A Through C Only (PDF)
- 04B Final Environmental Impact Report Appendices A Through C with Letter Attachments (PDF)
- Notice of Final Environmental Impact Report 02-24-2017(PDF)
Appendices
- Appendix 10.1 Public Scoping (PDF)
- Appendix 10.2 Project Documents Part A (PDF)
- Appendix 10.2 Project Documents Part B (PDF)
- Appendix 10.2 Project Documents Part C (PDF)
- Appendix 10.3 Air Quality and Greenhouse Gas Modeling (PDF)
- Appendix 10.4 Habitat Assessment (PDF)
- Appendix 10.5 Clean Water Factory Low Flow Study Part A (PDF)
- Appendix 10.5 Clean Water Factory Low Flow Study Part B (PDF)
- Appendix 10.5 Clean Water Factory Low Flow Study Part C (PDF)
- Appendix 10.6 Identification of Historic Properties (PDF)
- Appendix 10.7 Paleo Report (PDF)
- Appendix 10.8 Noise Modeling (PDF)
- Appendix 10.9 Geotechnical and Geohaz Evaluation Revised (PDF)
- Final Appendix 10.10 Alabama Street Pipeline Studies (PDF)
View construction progress of the Tertiary Treatment System and other projects located at the SBMWD Water Reclamation Plant.